人民长江
• 论文 • 上一篇 下一篇
吴培军, 段明 ,陈江, 叶群 ,计勇
出版日期:
发布日期:
WU Peijun, DUAN Ming, CHEN Jiang, YE Qun, JI Yong
Online:
Published:
摘要: 根据鄱阳湖水利枢纽项目建议书中的调度方案,构建了鄱阳湖二维水动力模型,并设置了20个工况进行了水动力情景模拟;同时,定量分析了鄱阳湖水利枢纽调度对水资源利用的影响。结果表明:调度初期,水利枢纽的影响范围最大;随着调度水位的降低,水位影响程度由北向南减小;干旱年、特大干旱年,取水口外水位可以基本满足取水的要求。研究成果可为鄱阳湖的综合治理提供科学依据。
关键词: 水资源利用, 水利枢纽调度, 水位影响, 水动力模型, 数值模拟, 鄱阳湖水利枢纽;
Abstract: According to the dispatching scheme in the project proposal of Poyang Lake Water Control Project,we constructed a two-dimensional hydrodynamic model and quantitatively analyzed the influence of Poyang Lake Water Control Project on dispatching water resources utilization in the lake area under 20 working conditions.The results showed that:in the early stage,the influence of project's dispatching on water resources utilization was the largest;while,the influence decreased from north to south with the decrease of water level after dispatching.In addition,the water level outside the water intake can basically meet the requirements of water diversion in drought and extremely drought years through dispatching.The results can provide reference for comprehensive management of Poyang Lake.
Key words: water resource utilization, water control project dispatching, water level impact, hydrodynamic model, numerical simulation, Poyang Lake Water Control Project,
吴培军, 段明,陈江, 叶群,计勇 . 鄱阳湖水利枢纽调度对鄱阳湖水资源利用的影响 [J]. 人民长江, doi: 10.16232/j.cnki.1001-4179.2020.09.019 .
WANG Lei, YU Xinxin, CHEN Wenwen, SHEN Xiaomei . Influence ofPoyang Lake Water Control Project dispatching on water resources utilization in Poyang Lake[J]. , doi: 10.16232/j.cnki.1001-4179.2020.09.019 .
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://www.rmcjzz.com/CN/10.16232/j.cnki.1001-4179.2020.09.019
http://www.rmcjzz.com/CN/Y2020/V51/I9/101