摘要: 介绍了珠海横琴新区口岸服务区段堤岸工程的概况,分析了堤岸工程设计的重点和难点。对堤岸断面设计、基础处理设计、涵洞结构设计以及工程耐久性设计等方面作了详细论述。说明了口岸服务区段堤岸工程设计不同于常规堤岸工程的特点和要求。目前,横琴新区基础设施工程的设计、施工正处于高峰阶段,该工程的一些设计经验对类似工程具有参考、借鉴作用。
关键词: 断面型式, 基础处理, 涵洞, 耐久性, 堤岸工程设计
Abstract:
The general conditions of sea dyke works in Zhuhai Hengqin port service area are introduced, the critical and difficult points in the design of dyke works are analyzed, especially the dyke section design, foundation treatment, culvert structure and dyke durability. The characteristics and requirements of the dyke works in the port service area, which is different from the conventional dyke works, are explained. At present, the design and construction of infrastructure works in this area are in peak period, some experiences and measures can provide reference for the similar works.
Key words: section type, foundation treatment, culvert, durability, design of sea dyke works
柏宝忠 吴雄远 周志业. 珠海横琴新区口岸服务区段堤岸工程设计[J]. 人民长江, doi: 10.16232/j.cnki.1001-4179.2015.11.011.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://www.rmcjzz.com/CN/10.16232/j.cnki.1001-4179.2015.11.011
http://www.rmcjzz.com/CN/Y2015/V46/I11/44