锦屏水电站高压线塔基边坡处理施工
王永兴 马文波
Construction of side-slope treatment of high-voltage line tower base of Jinping Hydropower Station
人民长江 . 2015, (20): 29 -31 .  DOI: 10.16232/j.cnki.1001-4179.2015.20.009