三峡船闸高边坡锚索预应力损失监测成果分析
樊少鹏肖碧 王公彬 闵征辉
Analysis of monitoring results of pre-stress loss in anchorage cables installed at high slope of ship-lock of Three Gorges Project
人民长江 . 2015, (24): 82 .  DOI: 10.16232/j.cnki.1001-4179.2015.24.020