山西中部引黄工程TBM长距离独头掘进通风研究
冯璐,田志斌
Analysis on ventilation issues of long-distance tunnel blind heading by TBM in Shanxi Central Yellow River Diversion Project
FENG Lu,TIAN Zhibin
人民长江 . 2018, (4): 67 -70 .  DOI: 10.16232/j.cnki.1001-4179.2018.04.013