摘要:
关键词: 渗控试验, 成果分析, 声波测试, 帷幕灌浆, 苗尾水电站
Abstract:
Due to the poor geological condition and serious seepage at the dam site of Miaowei Hydropower Station, the curtain grouting must be carried out. To ensure the curtain construction quality and provide design parameters for practical construction, the seepage control test of curtain grouting was conducted. This paper introduces the design scheme of grouting hole, check hole, uplift observation hole, construction procedure, the measures taken for special problem in the test and its effects. The seepage control test of curtain grouting achieved success and provided detail data for design and construction of curtain grouting.
Key words: curtain grouting, seepage control test, test result analysis, sound wave test, Miaowei Hydropower Station
李爱华 梁龙群. 苗尾水电站帷幕灌浆渗控试验成果分析及施工[J]. 人民长江, doi: 10.16232/j.cnki.1001-4179.2016.11.021.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://www.rmcjzz.com/CN/10.16232/j.cnki.1001-4179.2016.11.021
http://www.rmcjzz.com/CN/Y2016/V47/I11/77