人民长江
• 论文 • 上一篇 下一篇
郑霞忠 任瑞雪 王征
出版日期:
发布日期:
Online:
Published:
摘要: 针对组织界面管理的有效性问题,从信息、人员、工作流程和物资4个方面建立EPC项目组织界面管理有效性评价指标体系。运用SPSS和AMOS软件对收集的指标数据进行分析验证,保证指标体系的可靠性。应用改进灰色聚类方法,确定各指标灰色聚类权,计算对象综合聚类系数和所属灰类,得出评价结果。以酉酬水电站组织界面管理为例,计算出其有效性评价结果为中级,其中信息管理不足是造成组织界面管理有效性评价结果偏低的主要原因,由此证明该方法可行有效。
关键词: EPC项目, 组织界面管理, 改进灰色聚类, 酉酬水电站
Abstract:
Aiming at the effectiveness of EPC project organization interface management, we present an effectiveness evaluating index system of EPC project organization interface management from four aspects as information, personnel, work processes and materials. The collected index data were verified by SPSS and AMOS software to ensure the reliability of evaluating index system. Through reformed gray-clustering method, we determined the grey clustering weight,the comprehensive clustering coefficient of each index and its class and the evaluation results. In the example of organization interface management of Youchou Hydropower Station, the evaluation result belongs to middle grade level and the deficiency of information management is the main cause for the low efficiency of the organization interface management, which verifies the feasibility and effectiveness of the proposed method.
Key words: EPC Project;organization interface management, reformative gray-clustering method, Youchou Hydropower Station
郑霞忠 任瑞雪 王征. EPC项目组织界面管理有效性研究——基于改进灰色聚类方法[J]. 人民长江, doi: 10.16232/j.cnki.1001-4179.2016.15.023.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://www.rmcjzz.com/CN/10.16232/j.cnki.1001-4179.2016.15.023
http://www.rmcjzz.com/CN/Y2016/V47/I15/103