人民长江 ›› 2022, Vol. 53 ›› Issue (5): 111-117.doi: 10.16232/j.cnki.1001-4179.2022.05.018

• • 上一篇    下一篇

近十年可可西里盐湖水量变化及其影响因素分析

袁康;谭德宝;赵静;文雄飞;   

  • 发布日期:2022-06-27

Design of vertical water level observation platform in tidal river reach

ZHANG Zhongzhong   

  • Published:2022-06-27

摘要: 由于全球气候变暖的影响,青藏高原湖泊开始逐步扩张,对自然环境和野外基础设施产生了威胁。为研究气候变化对湖泊水量的影响,利用2010~2018年青海可可西里腹地盐湖(又名68道班盐湖)的CryoSat-2卫星测高数据和Landsat遥感影像数据,分别提取了盐湖的水位及面积,结合实测获取的盐湖水下地形数据,计算并构建库容关系曲线,并结合气候变化特征进行了驱动力分析。结果表明:(1) 2010~2011年,湖泊水量增加了0.2亿m3,这一阶段盐湖还是独立湖泊;之后上游卓乃湖、库赛湖、海丁诺尔湖3个湖泊的湖水开始注入盐湖,盐湖成为流域水量“接收者”,水量开始快速增加,仅1 a就暴涨近12亿m3(该阶段主要为上游3个湖泊溢出水量);2016年开始以平均每年约5.5亿m3的速度上涨;9 a间,盐湖的水量增加近33亿m3,并且作为流域水量的“接收者”,盐湖还在持续扩张。(2)降水量增加是盐湖扩张的主要因素,温度上升引起的冰川融化和冻土融水是湖泊变化的另一气候因素,但可能不是决定性因素。

关键词: 高原湖泊;水量变化;水位变化;气候变化;遥感数据;68道班盐湖;

Abstract: The vertical water level observation platform is often used to record water level data in long-term important hydrological stations. The hydrological characteristics of tidal river reach are complex, and the water level is affected by hydrodynamic factors such as river flow, tide and waves, etc., which can easily cause problems of platform structure stability and water level observation accuracy. Therefore, for the Minjiang estuary hydrological station project we study and design a vertical water level observation platform in the tidal river reach. Through the relevant codes and standards analysis, space numerical model calculation and project cost comparison, we put forward a principle for the scheme selection of water level observation platform and aperture determination. It is suggested that the conventional water level observation platform in the tidal river reach should adopt the shore-type scheme, while the island-type elevated pile caps platform scheme should be adopted for special needs; the diameter of the inlet hole should be determined by standard formula calculation while reserving an appropriate margin. The practice showed that the observation data of the new water level observation platform of Minjiang estuary station met the accuracy requirements of water level observation in tidal river reach. The research results can be used as reference for subsequent similar projects.

Key words: water level observation platform; scheme selection; structure stability; diameter of inlet hole; tidal river reach