人民长江 ›› 2022, Vol. 53 ›› Issue (5): 221-226.doi: 10.16232/j.cnki.1001-4179.2022.05.034

• • 上一篇    下一篇

高地应力软弱破碎围岩下长锚孔适配钻孔机具研究

王治才;陈伟祥;朱安龙;郭新新;王振宇;汪波;   

  • 发布日期:2022-06-27

Adapting drilling tool for long anchor hole under high ground stress and soft fractured surrounding rock

WANG Zhicai1, CHEN Weixiang1, ZHU Anlong2, GUO Xinxin3, WANG Zhenyu3, WANG Bo3   

  • Published:2022-06-27

摘要: 选择适配钻孔机具以实现长锚孔的高效稳定成孔,是长锚杆(索)支护技术在高地应力软弱破碎围岩隧道中进一步推广应用的关键前提。以渭武高速木寨岭公路隧道为工程依托,开展了高应力软弱破碎围岩适宜钻机现场选型及钻头适配性研究。研究结果表明:(1)钻机钻进效率方面,YT28钻的钻进效率明显优于YG80钻,高地应力软弱破碎围岩隧道中提高钻机冲击频率可有效改善钻孔效率,应选择冲击频率作为钻机控制性指标;(2)钻头钻进效率方面,“一”字型钻头要优于“十”字型钻头,钻进5,10 m孔深时的施工耗时分别要少8,7 min,但存在着卡钻现象频发的缺陷;(3)钻头使用寿命方面,“十”字型钻头的平均有效钻进长度为35 m,显著优于“一”字型钻头的20 m;(4)钻头成孔效果方面(要求预紧力>300 kN),“十”字型钻头打设深5,10 m钻孔的锚固成功率分别为98%,95%,显著优于“一”字型钻头的89%,75%。研究成果可为高地应力软弱破碎围岩隧道长锚孔钻孔作业提供指导与借鉴。

关键词: 钻孔机具;长锚孔;高地应力;软弱破碎围岩;木寨岭公路隧道;

Abstract: The selection of suitable drilling tool for the efficient and stable formation of long anchor holes is crucial for further applying long anchor bolt (cable) support technology in tunnels with soft fractured surrounding rock under high ground stress. Relying on the Muzhailing highway tunnel of Weiyuan-Wudu expressway, the in-situ selection of applicable drilling rigs and the adaptability study of drill bits were carried out. The results showed that: ① YT28 was vastly superior to YG80 in the aspect of drilling efficiency, which demonstrated that in tunnel with soft fractured surrounding rock under high stress, the drilling efficiency of rigs can be effectively improved by increasing the percussion frequency, so the percussion frequency should be considered as the control index. ② The I-shaped drilling bit is superior to the cross-shaped drilling bit in the aspect of drilling efficiency, that the formation time of 5m and 10m holes is 8 minute and 7 minute less respectively, but there was a defect of frequent jamming of the I-shaped drilling bit. ③ In terms of the service life, the average effective drilling length of the cross-shaped was 35m, which was vastly superior to the I-shaped (20m). In terms of hole-forming effect (required pre-tightening force > 300kN), the anchoring success rates for 5m and 10m holes drilled by cross-shaped drilling bit were 98% and 95% respectively, which was significantly better than the holes drilled by I-shaped drilling bit (89% and 75% respectively). The research results can provide guidance and reference for the drilling operations of long anchor holes in tunnels with soft fractured surrounding rock under high ground stress.

Key words: drilling tool; long anchor hole; high ground stress; soft fractured surrounding rock; Muzhailing highway tunnel