人民长江 ›› 2022, Vol. 53 ›› Issue (12): 118-117.doi: 10.16232/j.cnki.1001-4179.2022.12.018

• • 上一篇    下一篇

乌东德水电站K25溶洞集控楼三维设计关键技术研究

王宁;李丽君;周自清;殷俊;   

  • 发布日期:2023-01-17

Research on key technology of three-dimensional design of centralized control building of Wudongde Hydropower Station located in K25 karst cave

WANG Ning,LI Lijun,ZHOU Ziqing,YIN Jun   

  • Published:2023-01-17

摘要: 目前水利工程三维设计与BIM技术应用已从单专业、单阶段向全过程、多专业协同方式转变。单一软件平台很难满足全过程三维设计应用需要,因此多软件协同完成设计成为目前的主要策略。在乌东德水电站K25溶洞集控楼设计工作中,为解决复杂的地形环境、建筑异形外形及内部复杂构造等带来的技术难题,采用多软件协同完成了从方案到施工图全过程三维设计。通过SketchUp、Rhino、Revit等多个三维软件配合,完成了洞壁、混凝土回填、异形幕墙等复杂形体建模及BIM模型整合,最终通过BIM模型生成施工图纸。K25溶洞集控楼设计作为一次多软件协同设计技术实践,不仅为类似水利工程三维设计提供参考,也为今后该工程后期多平台数据融合工作奠定了基础。

关键词: 水电站建筑物;建筑信息模型;建筑设计;三维设计;多平台协同;K25溶洞;乌东德水电站;

Abstract: At present,the application of 3D design and BIM technology in hydraulic engineering has changed from single specialty and single stage to the whole process and multi-specialty cooperation.It is difficult for a single software platform to meet the needs of 3D design application in the whole process,so multi software collaborative design has become the main strategy at present.In the design of centralized control building of Wudongde Hydropower Station located in K25 karst cave,due to the difficulties such as complex terrain environment,building special-shaped surface and complex internal structure,multi software was used to complete the whole process of three-dimensional design from scheme to construction drawing.Through the cooperation of SketchUp,Rhino,Revit and other 3D design software,various specialties cooperated to complete the modeling of complex shapes such as cave wall,concrete backfill and special-shaped curtain wall and the integration of BIM model,and finally generated construction drawings through BIM model.As a multi software collaborative design technology practice,the design of centralized control building located in K25 karst cave not only provides a reference for the 3D design of similar hydraulic projects,but also lays a foundation for multi-platform data fusion in the later stage of the project.

Key words: hydropower buildings;BIM;architectural design;3D design;cooperate design of multi software platforms;K25 karst cave;Wudongde Hydropower Station