人民长江 ›› 2025, Vol. 56 ›› Issue (4): 192-199.doi: 10.16232/j.cnki.1001-4179.2025.04.026

• • 上一篇    

白鹤滩水电站左坝肩边坡蓄水期稳定性分析

谭尧升,俞钟杰,陈文夫,裴磊,荣冠   

  • 收稿日期:2024-04-28 出版日期:2025-04-28 发布日期:2025-04-28

Stability analysis on left dam abutment slope of Baihetan Hydropower Station during early stage of impoundment

TAN Yaosheng,YU Zhongjie,CHEN Wenfu,PEI Lei,RONG Guan   

  • Received:2024-04-28 Online:2025-04-28 Published:2025-04-28

摘要: 白鹤滩水电站左岸坝肩边坡地质条件复杂,断层、错动带分布广泛。以白鹤滩水电站左岸坝肩边坡为研究对象,结合水文地质资料和现场监测成果,分析了蓄水期左岸坝肩边坡的变形规律和控制因素。分析结果表明:①变形最大值出现在坝肩下游 800m 高程临空侧,变形量为 17.2mm;边坡变形以 0~15m 范围的浅层变形为主,深部岩体受蓄水的影响较小。②蓄水后左岸C3​、C3−1​层间错动带和LS3319​、LS331​层内错动带发生剪切变形。③拱肩槽上游侧边坡变形受库水位控制,水下岩体朝坡内变形,水上岩体朝坡外蠕变;拱肩槽下游侧边坡变形受软弱结构面控制,整体向坡外和下游侧变形;拱肩槽边坡受到拱坝自重以及拱端推力的作用,朝坡内变形。与同类工程相比,白鹤滩水电站蓄水期间左岸坝肩边坡的变形处于较低水平,总体稳定性好

关键词: 坝肩边坡变形;拱肩槽;变形监测;控制因素;白鹤滩水电站

Abstract: The geological conditions at the left dam abutment slope of Baihetan Hydropower Station are complex with widespread faults and dislocation belts. Combining with hydrogeological data and field monitoring results, we analyzed the deformation law and corresponding control factors of the left bank abutment slope during the impoundment period. The results showed that: ①the maximum deformation occurred at the free side of the 800 m elevation downstream of the dam abutment, which was up to 17.2 mm. The slope deformation was mainly shallow deformation within 0~15 m, and the deep rock mass was less affected by impoundment. ②After impoundment, the shear deformation of the C3​ and C3−1​ interlayer staggered zones on the left bank and the LS3319​ and LS331​ intralayer staggered zones occurred. ③The deformation of the slope on the upstream side of the abutment grove was controlled by the reservoir water level, namely the underwater rock mass deformed towards the inside of the slope, and the rock mass above water creeped slowly towards the outside of the slope. The deformation of the downstream slope of the abutment groove is controlled by the weak structural planes, and the slope deformed to the outside and downstream side. Subjected to dam self-weight and arch end thrust force, the slope of abutment groove deformed towards inner mountain side. Compared with similar projects, the deformation at the left dam abutment slope of Baihetan Hydropower Station is at a low level during the impoundment period, and the overall stability is good.

Key words: slope deformation of dam abutment; arch dam abutment groove; deformation monitoring; control factor; Baihetan Hydropower Station