摘要: 现有光纤传感器的布设方法单一,无法完全适应各类工程的监测要求。为此,从实际工程桩体水平位移监测的需求出发,针对工程施工特点,设计单U型和多U型布设方法,并于室内构建PVC管简支梁模型,利用分布式光纤传感器对PVC管弯曲变形应变进行测量。采用各类应变组合进行挠度计算,分析了各应变组合挠度的试验误差。将上述两种光纤布设方法分别运用于实际工程的桩体水平位移监测中,并对比分析光纤传感器监测数据效果。试验与实际工程分析结果表明:利用分布式光纤计算桩体位移时,应当优先选用垂直基坑开挖面的双轴线应变进行计算,其次可利用其他轴线应变换算成基坑侧应变,进而用双轴线应变计算,而多轴线应变计算会造成多余误差;在实际工程运用时,分布式光纤传感器监测效果优于侧斜管监测效果。

关键词: 基坑监测;围护结构;光纤传感器;光纤布设方法;位移计算;

Abstract: In order to solve the problems of prominent large deformation and difficult construction of shallow-buried section of tunnel entrance under water-rich condition, based on the Dongfengshan tunnel project under construction in Fuzhou City, the failure characteristics and causes of large deformation of tunnel section were analyzed in detail, and the corresponding countermeasures were put forward. The results showed that the large deformation was mainly caused by vault settlement due to the influence of stratum, topography, water environment and construction, and the deformation increased sharply in a short time after excavation. The large deformation of tunnel section presented a three-stage change rule of 'rapid growth, slow growth and stable trend'. The rapid growth stage was mainly concentrated before the next step excavation, and the deformation of surrounding rock accounts for about 75 %~80 % of the whole settlement deformation. According to the analysis of large deformation, it was proposed that the auxiliary reinforcement measures of 'advanced curtain grouting with well point precipitation' should be adopted before excavation, to improve the construction environment of surrounding rock in front of the working face. During excavation, the steel frame type strengthening, large-diameter locking foot at middle and lower steps and large arch foot at upper steps should be adopted, which can control the development of large deformation of tunnel to a large extent and ensure the safety of tunnel construction. The relevant experience can be used for reference in similar projects.

Key words: shallow-buried tunnel under water-rich condition; large section tunnel; large deformation; vault settlement; countermeasures; Dongfengshan tunnel