曹正浩,闫弈博,毛文耀,黄会勇
出版日期:
发布日期:
CAO Zhenghao, YAN Yibo, MAO Wenyao, HUANG Huiyong
Online:
Published:
摘要: 以南水北调中线一期工程建成通水,引汉济渭工程、鄂北水资源配置工程开工建设为背景和边界条件,以引江济汉工程设计功能为目标,研究了引江济汉工程水量调度方案。根据引江济汉工程、汉江中下游河道内外用水实际情况,建立了引江济汉工程水量调度模拟模型。以不同规划对汉江中下游河道外需水预测、不同丹江口工程下泄流量为方案变量,初步提出了引江济汉工程水量调度的规则。
关键词: 水量调度, 鄂北水资源配置工程, 引汉济渭, 引江济汉, 汉江
Abstract: Under the background of a series of water diversion project constructions, such as Stage I Works of Middle Route Project of South-North Water Diversion, the construction of Water Diversion Project from Hanjiang River to Weihe River and Northern Hubei Province Water Resources Allocation Project, with the goal of fulfilling the design function of Water Supplement Project to Hanjiang River from Changjiang River, the water amount dispatch scheme for this water supplement was studied. According to the Water Supplement Project to Hanjiang River from Changjiang River and practical water use conditions of lower reach of the Hanjiang River, the water dispatch simulation model for the water supplement was established. With the consideration of the water demand of the lower reach of the Hanjiang River and discharge from Danjiangkou Reservoir, the water dispatch scheme of the Water Supplement Project to Hanjiang River was preliminarily put forward.
Key words: water amount dispatch, Northern Hubei Province Water Resources Allocation, Water Diversion Project from Hanjiang River to Weihe River, Water Supplement Project to Hanjiang River from Changjiang River, Hanjiang
曹正浩,闫弈博,毛文耀,黄会勇. 引江济汉工程水量调度方案初步研究[J]. 人民长江, doi: 10.16232/j.cnki.1001-4179.2018.13.013.
CAO Zhenghao, YAN Yibo, MAO Wenyao, HUANG Huiyong. Preliminary study on water amount dispatch scheme of Water Supplement Project to Hanjiang River from Changjiang River[J]. , doi: 10.16232/j.cnki.1001-4179.2018.13.013.