人民长江

• 论文 • 上一篇    下一篇

双爬升锥多点悬吊技术在深竖井灌浆中的应用

李国华,刘协,彭会椿   

  • 出版日期:2018-07-28 发布日期:2018-07-28

Application of double climbing cones with multi-point suspension in grouting of deep shaft

LI Guohua, LIU Xie, PENG Huichun   

  • Online:2018-07-28 Published:2018-07-28

摘要: 针对巴基斯坦N-J水电工程引水调压竖井灌浆作业的高危险性以及井口扩大空间受限、无法布置多套悬吊设备等问题,设计出一套以环向8组双爬升锥作为主悬吊点、4条安全绳作为辅助悬吊的钻灌平台悬吊系统。对悬吊系统的结构及工作原理进行了详细介绍,并对悬吊系统主操作平台在最不利工况下的受力进行了计算校核。工程实践表明,双爬升锥多点悬吊技术的使用降低了施工成本、简化了施工过程、施工效率满足工期要求,可为类似竖井灌浆及排水孔施工提供良好的借鉴。

关键词: 爬升锥, 竖井, 灌浆, 钻孔, 平台悬吊

Abstract: The grouting for headrace surge shaft of Neelum Jhelum Hydropower Project is featured with extremely high safety risk and non-availability of multiple sets of suspension equipment due to the limited space of the surge shaft chamber. To solve these problems, a suspension system for the drilling and grouting platform that consisted of eight groups of double climbing cones (serve as main suspension point) and four safety ropes (serve as auxiliary suspension) was designed. The structure and working principle of this suspension system was introduced in detail, and the stress of the main operating platform of the suspension system under the most unfavorable working condition was calibrated. The engineering practice showed that the application of double climbing cones with multi-point suspension technology could reduce the construction cost, simplify the construction process and improve the construction efficiency, and could provide an useful reference for similar shaft grouting and drainage hole construction.

Key words: climbing cone, shaft, grouting, drilling, suspend platform