引江济汉工程施工风险控制与管理

程琍 胡小梅 李德 张新 陈崇德   

  • 出版日期:2016-01-30 发布日期:2016-01-30

Control and management of construction risk of Water Transfer Project from Yangtze River to Hanjiang River

  • Online:2016-01-30 Published:2016-01-30

摘要: 根据南水北调中线一期引江济汉工程荆州段施工风险控制与管理的现状,对施工风险的类型与辨识、施工风险分析与等级判定的准则、施工风险控制与管理的主要措施作了较为详细的分析。并对施工现场可能出现的风险项目进行评价,结果表明,该工程风险等级主要为中等或轻微水平,但必须引起高度重视。

关键词: 施工风险, 风险分析, 控制措施, 南水北调中线一期工程, 引江济汉工程

Abstract:

According to the situation of control and management of the construction risk in Jingzhou reach of Water Transfer Project from Yangtze River to Hanjiang River, first phase of Middle Route Project of South to North Water Diversion Project, the types and recognition of the construction risk, the principle for analyzing the construction risk and determining its grade, main measures of controlling and managing the construction risk are introduced. The possible construction risk in the construction site is evaluated. It is concluded that the risk is medium or slight, which still needs to be paid attention to as well.

Key words: construction risk, risk analysis, controlling measure, first phase of Middle Route Project of South to North Water Diversion Project, Water Transfer Project from Yangtze River to Hanjiang River