Difficulties and countermeasures in construction of impervious wall for energy dissipation pool of Huangjinping Hydropower Station

  • Online:2016-06-14 Published:2016-06-14

摘要: 黄金坪水电站消力池防渗墙施工存在地质结构复杂,漂石、孤石多,施工场地狭窄,施工干扰大等问题。经分析,决定针对漂石、孤石等地层,采用聚能爆破和槽内钻孔爆破技术进行钻孔施工;对于架空区渗漏封堵,采用搅拌黏度极大的特殊正电胶浆进行处理。在施工技术确定的情况下,充分考虑到施工中可能出现的影响因素,制定了详细的施工流程,以期保证工程施工的顺利进行。

关键词: 施工难点, 施工方案, 黄金坪水电站, 混凝土防渗墙

Abstract:

The problems such as complex geological condition, a lot of boulders, narrow construction field and construction interference etc. were existed in the construction of impervious wall for energy dissipation pool of Huangjinping Hydropower Station. According to the analysis, the shaped charge blasting and borehole drilling in groove were adopted for the boulder stratum etc.; the special positive grout with high viscosity was adopted for seepage blocking in hollow space. Under the given construction technology, the detail construction scheme was made to ensure the smooth construction.

Key words: construction difficulty, construction scheme, Huangjinping Hydropower Station, concrete impervious wall