张丽娟,韩江
出版日期:
发布日期:
ZHANG Lijuan1,HAN Jiang
Online:
Published:
摘要: 为选择东江-东莞供水工程的最优方案,对工程中东江与水库联网方案进行了研究。分析了鲤鱼洲、沙角和鳌峙塘3个取水方案的优缺点,比较了松木山、芦花坑等9座水库间的环状闭合、环状不闭合和树状联网方式的优劣。最终推荐采用沙角取水和环状闭合水库联网的方式。推荐方案达到了抽引东江水入水库调蓄的要求,可提高东莞市中部及沿海片区供水保证率,缓解供需矛盾。
关键词: 取水口, 供水保证率, 江库联网工程, 供水工程, 东莞市
Abstract: To select the optimized scheme of Dongjiang River to Dongguan City water supply project, research was conducted on the scheme of river and reservoir connection. In the research, the merits and demerits of 3 water intake sites called Liyuzhou, Shajiao and Aositang are analyzed. 3 connection schemes of circular closure, circular non-closure, dendritic structure for 9 reservoirs called Songmushan, Luhuakeng etc. were compared. The scheme of water intake at Shajiao and circular closure was proposed, which can meet reservoir’s impounding demand of pumping from the Dongjiang River, increase water supply guarantee?for the central area as well as coastal area of Dongguan City, and ease water supply and demand contradiction.
Key words: river and reservoir connection, water intake, connection type, guarantee ratio of water supply, Dongguan City
张丽娟,韩江. 东江-东莞供水工程江库联网工程方案比选研究[J]. 人民长江, doi: 10.16232/j.cnki.1001-4179.2019.02.029.
ZHANG Lijuan1,HAN Jiang. Scheme comparison of river-reservoir connection of Dongjiang River to Dongguan City water supply project[J]. , doi: 10.16232/j.cnki.1001-4179.2019.02.029.